Alloa NCB Workshops



Dates

  /01/1954Alloa NCB Workshops
Opened by the National Coal Board to replace smaller workshops at the Whins, Alloa, and Fallin. The works and stores were opened by the railway and could overhaul locomotives.
  /  /1967Alloa NCB Workshops
Closed.