Cardiff Riverside Branch (Taff Vale Railway)



Dates

14/08/1893Barry Dock and Railways
Start to use Cardiff Riverside station on the Cardiff Riverside Branch (Taff Vale Railway).
02/04/1894Barry Dock and Railways
Start to use Clarence Road station on the Cardiff Riverside Branch (Taff Vale Railway).

Locations along the line

These locations are along the line.