Edinburgh Loanhead and Roslin Railway



Dates

  /  /1870Edinburgh Loanhead and Roslin Railway
Act receives Royal assent.
06/11/1873Edinburgh and Dalkeith Railway
Edinburgh Loanhead and Roslin Railway opened from Millerhill Junction.
01/05/1933Edinburgh Loanhead and Roslin Railway
Glencorse to Millerhill closed to passengers.
01/07/1959Edinburgh Loanhead and Roslin Railway
Glencorse (Penicuik Gas Works) to Roslin closed to freight.
01/06/1969Edinburgh Loanhead and Roslin Railway
Roslin to Bilston Glen Colliery (excluded) closed to freight.
  /  /1993Edinburgh and Dalkeith Railway
Stub of Edinburgh Loanhead and Roslin Railway from Millerhill Junction to Bilston Glen Colliery closed.
  /  /2002Edinburgh Loanhead and Roslin Railway
Buffer stop placed on line 1/4 mile from Millerhill Junction. Loops by junction renovated.