Sellafield Powerstation




Locations along the line

These locations are along the line.



Sellafield works diesel shunter No.1, seen from a train slowing for the nearby station on 19th April 2023. Numerous flask wagons could be seen in the ...
Mark Bartlett 21/04/2023
Glimpsed from a passing train, two new CBD80 Diesel Hybrid locomotives at Sellafield Nuclear Decommissioning plant. These two 80 tonne Bo-Bo Hybrid ...
Gordon Steel 30/06/2021
2 of 2 images.