Nearly 9 months after the derailment at Carrbridge see image 27143, work is still ongoing to replace the cables that were damaged in January. The temporary ones are currently being replaced with fully ducted cables around the station passing loop. Also, the resident's garage that was flattened in the incident has this week been replaced with a
brand new one.
Location: Carrbridge
Original line: Inverness and Aviemore Direct Railway (Highland Railway)
Photographer: Gus Carnegie
Contact photographer: Gus Carnegie
Date: 17/09/2010
Image number: 30731