The Cutty Sark (Braehead) construction site viewed from Bredisholm Road on 25th February 2015 see image 46153. The new viaduct over the M8 extension will be constructed alongside the railway line and slid into place during a 2-week line closure in July 2015.
Location: Bargeddie Bridge
Original line: Rutherglen and Coatbridge Railway
Photographer: Colin McDonald
Contact photographer: Colin McDonald
Date: 25/02/2015
Image number: 50476