Look what Father Christmas has left! With the railway closed for Christmas Day and Boxing Day, a new footbridge and two of the three lift shafts had appeared by early afternoon. By end of the day the third lift shaft had been craned into position and each had a roof. In the foreground is the old footbridge which will be removed during 2016. Even with atrocious weather conditions that the workforce had to endure during the day, it appears that very good progress has been made.
Location: Leyland
Original line: North Union Railway
Photographer: John McIntyre
Contact photographer: John McIntyre
Date: 25/12/2015
Image number: 53679