Glasgow Queen Street High Level

The assembled main truss (centre right) of the new extension to Glasgow Queen Street lies waiting to be lifted into place overnight on 26th-27th January 2019. According to Network Rail, two 500 tonne cranes will be used in a tandem lift, requiring 'close coordination & skill from crane operatives to lift & position the 66 tonne - 53 metre main truss section so it can be fixed to supporting steel.' The structure on the left is the west truss which was lifted into place in mid-December 2018.

Location: Glasgow Queen Street High Level

Original line: Edinburgh and Glasgow Railway

Photographer: Colin McDonald

Contact photographer: Colin McDonald

Contact editor

Date: 25/01/2019

Image number: 67335


Other photographs of Glasgow Queen Street High Level on RailScot