A shot of a new drain on the extension to the S&CR, which is under construction in January 2022. The original culvert had collapsed, therefore a new pipe was needed. All in all that cost £10K with diggers and piping etc. All donations welcome.
Location: Cricklade
Original line: Swindon and Cheltenham Extension Railway
Photographer: Peter Todd
Contact photographer: Peter Todd
Date: 06/01/2022
Image number: 79703