Having just deposited a couple of Polybulk grain hoppers in the yard at Cameron Bridge in 1988, 20212 and 20179 head for Methil Power Station to collect empty coal wagons. (In the background are the bridges over the River Leven which may need special measures. The track was left in place after most of the rest of the branch was lifted in 2021. Lifted in March). 20179 was withdrawn the following year, with 20212 lasting a couple of years longer. Both were broken up at MC Metals in Glasgow.
Location: Cameron Bridge [1st] (former)
Original line: Leven Railway
Photographer: Bill Roberton
Contact photographer: Bill Roberton
Date: 1988
Image number: 80635