LU 1995 stock on a Northern Line service to Morden heading away from the camera as it departs from the wide new southbound platform at Bank on the first day of operation, 16th May 2022. The Northern Line between Moorgate and Kennington was temporarily closed in January 2022 to allow the upgrading works to proceed and reopened on schedule. Trains through this and London Bridge stations are on a right-hand running section and the northbound platform has not been widened but a new lengthy pedestrian foot tunnel (where a travellator might have been built) occupies the former southbound platform site with the new southbound platform and running tunnel built to the west of that.
Location: Bank [C and SLR]
Original line: City and South London Railway
Photographer: David Bosher
Contact photographer: David Bosher
Photosets: LU Northern Line + 1938 and 1995 stock, 1973-2022
Date: 16/05/2022
Image number: 80985