Increased work volume means more vehicle movements on the project to construct the new Levenmouth rail link. A Moxy crosses a bridge fitted with bog mats and timber.
Location: Cameron Bridge
Original line: Leven Railway
Photographer: Network Rail
Contact photographer: Network Rail
Date: 11/08/2022
Image number: 82009