View from new Luton Airport DART train, on its first run on Friday 10th March 2023, around the halfway point as the line climbs towards the airport, only to plunge into a tunnel for the last 100 yards to the terminal station. I overheard somebody ask the DART staff if this was a possible future intermediate station to be told that it is actually an emergency alighting point.
Location: Luton DART Terminal
Original line: Luton DART
Photographer: David Bosher
Contact photographer: David Bosher
Photosets: Luton DART Opening Day, afternoon of Friday, 10.3.23
Date: 10/03/2023
Image number: 84796