The diversion route takes traffic from the A955/B933 roundabout, through the swimming pool car park and across the river via the temporary bridge. Traffic will then join the existing road network at the new roundabout that has been constructed on South Street (B932).
The new temporary crossing, which has been funded by Fife Council, will support 18,000 vehicle movements per day during major work by Network Rail to demolish the old bridge as part of the Levenmouth Rail Link project.
Location: Leven
Original line: Leven Dock Railway
Photographer: Network Rail
Contact photographer: Network Rail
Date: 05/2023
Image number: 85438