Network Rail has commissioned the signalling system on the new £116m Levenmouth Rail Link - meaning trains can use the line.
The signalling was successfully tested and brought into use over the weekend (January 6/7) and ScotRail will now be able to begin training drivers on the new route.
This will see a significant number of trains on the track in coming weeks as drivers develop their knowledge of the new section of railway between Thornton Junction and Leven Station.
Completion of the signalling and the start of driver training is a major step on the way to reconnecting Leven to the mainline railway with passenger services set to begin this summer.
Location: Leven
Original line: Leven Dock Railway
Photographer: Network Rail
Contact photographer: Network Rail
Date: 01/2024
Image number: 88610