Newry Edward Street

Location type

Station


Name and dates

Newry Edward Street (1854-1965)

Opened on the Town of Newry Connecting Railway.

Opened on the Newry and Greenore Railway.

Opened on the Newry and Enniskillen Railway.



Dates

  /  /1853Newry and Enniskillen Railway
Work begins on line from Newry Edward Street to Goraghwood.
  /  /1854Newry and Enniskillen Railway
Extension from Newry Edward Street to Newry Albert Basin opened.
  /03/1854Newry and Enniskillen Railway
Line opened from Newry Edward Street to Goraghwood (Dublin and Belfast Junction Railway).
  /  /1857Town of Newry Connecting Railway
Incorporated to connect the Newry, Warrenpoint and Rostrevor Railway (near Newry Kilmorey Street) to the Newry and Enniskillen Railway (at Newry Edward Street), at the latter using a short portion of upgraded Newry Albert Basin line.
  /  /1861Town of Newry Connecting Railway
Newry Dublin Bridge to Newry Edward Street (Newry and Enniskillen Railway) opened.
  /  /1877Newry and Greenore Railway
Goods line extended from Newry Bridge Street to Newry Edward Street (GNR [I]).
  /  /1877Town of Newry Connecting Railway
Dundalk, Newry and Greenore Railway makes connection at Newry Edward Street.
  /  /1880Newry and Greenore Railway
Newry Bridge Street to Newry Edward Street comes into passenger use.
  /  /1907Town of Newry Connecting Railway
Two single track parallel lines converted into double track southwards from Newry Edward Street to King Street Junction (point of division between the line to the Newry, Warrenpoint and Rostrevor Railway and Dundalk, Newry and Greenore Railway).
  /  /1963Town of Newry Connecting Railway
Newry Edward Street to King Street Junction becomes single track.