Date: 20/09/2017
Passengers travelling between London Bridge, Gatwick Airport and Brighton now have brand new Thameslink trains that are up to three times longer giving more space and more seats. Govia Thameslink Railway (GTR) has withdrawn the last of its older trains from this off-peak service, replacing them with cutting-edge Siemens Class 700 carriages.
External links
Rail News
The brand new trains have a spacious design and cutting-edge information systems that will tell passengers how Londons Tube trains are running and even...