Date: 28/02/2019
Platforms 5 and 6 at Edinburgh Waverley, recently extended to 275 metres in length to accommodate new 10-car trains due to be introduced on the main line between Edinburgh and London later this year, have now re-entered service. An LNER train heading south was the first to use the freshly refurbished platforms, extended for the []
External links
Rail Engineer
Platforms 5 and 6 at Edinburgh Waverley, recently extended to 275 metres in length to accommodate new 10-car trains due to be introduced on the main line betwe
Edinburgh Waverley
This is the main station in Edinburgh and acts as both a terminus and through station. The larger part of the station is covered by a large glazed roof by Blyth and Cunningham and is an island platfor
Related images