Date: 06/08/2020
Hundreds of lorry loads of timber could be removed from the A9 in Ross-shire after almost £200,000 was allocated to a rail freight trial by Victa Railfreight.
External links
Ross-shire Journal
HUNDREDS of lorry loads of timber could be removed from the A9 in Ross-shire after almost £200,000 was allocated to a rail freight trial.
Related news items
Tags: x Timber x Far North Line x Georgemas Junction x Inverness x Transport Scotland x Victa Railfreight x Network Rail x Hitrans x Scottish Forestry x Norbord x Dalcross x A9