Date: 25/01/2021
Heavier than the Eiffel Tower, the tunnel was moved at 150cm per hour over nine days.
External links
BBC News
Heavier than the Eiffel Tower, the tunnel was moved at 150cm per hour over nine days.
Related images
Related news items
Tags: x Werrington Junction