Wales railway first: Work begins to lift bridge out of river flood zone [Network Rail]





Date: 13/05/2021

Network Rail engineers begin work to raise Black Bridge, near Machynlleth, on Saturday 15thMay to reduce passenger delays due to flooding.


External links

Wales railway first: Work begins to lift bridge out of river flood zone

Network Rail

Network Rail engineers begin work to raise Black Bridge, near Machynlleth, on Saturday 15thMay to reduce passenger delays due to flooding.

Related images

Flooding of the Black Bridge over the River Dulas. The bridge and its approaches will be raised to protect the line.
Location: Machynlleth
Company: Aberystwyth and Welch Coast Railway
// Network Rail


Related news items

Tags: x Machynlleth x Black Bridge x River Dulas