Date: 07/06/2021
Articles on electrification invariably focus on 25kV overhead systems or indeed the modern-day 50kV auto-transformer variant. The safety procedures that go with these are well documented and accidents are thankfully very rare. We must remember however that a significant percentage of the UK electrified railway uses live conductor rails positioned on the outside of one ...
External links
Rail Engineer
Related news items
Tags: x Third rail x Conductor rail