Date: 13/10/2021
Major work is taking place to upgrade the signalling system and track in Bridlington this month. Improvements will be carried out over nine days to reduce future disruption and bring a modern, more reliable railway for passengers
No trains to/from Bridlington between Saturday 23 and Sunday 31 October - busses will connect passengers between Driffield and Bridlington/Filey/Scarborough. On Friday 22 October, signallers at Bridlington South signal box will pull the levers for the last time before the 65-lever frame is upgraded with a modern control panel. Over nine days, the older mechanical signals next to the track will also be replaced with modern colour light ones.
External links
Network Rail
Major work is taking place to upgrade the signalling system and track in Bridlington this month Improvements will be carried out over nine days to reduce future disruption and bring a modern, more reliable railway for passengers No trains to/from Bridlington between Saturday 23 and Sunday 31 October “ busses will connect passengers between Driffield and Bridlington/Filey/Scarborough
Related images
Related news items
Tags: x Bridlington x Resignalling x Bridlington South Signal Box