Date: 02/01/2022
Rail passengers face slower journeys between Edinburgh and Newcastle because of a shortage of electric power on the east coast main line. TransPennine is now investigating whether software adjustments can be made to its Nova 1 trains so that they would draw less electric power from the overhead wires, permitting them to be switched from diesel.
External links
Scotsman
Rail passengers face slower journeys between Edinburgh and Newcastle because of a shortage of electric power on the east coast main line.
Related news items
Tags: x East Coast Main Line x Overhead Line Equipment x Electrification x Power Supply