Welsh timber returns to the railway for carbon-cutting test run [Network Rail]





Date: 06/05/2022

For the first time since 2005, a freight train carrying Welsh timber left Aberystwyth as part of a trial that could see regular freight traffic return to the Cambrian line.


External links

Welsh timber returns to the railway for carbon-cutting test run

Network Rail

For the first time since 2005, a freight train carrying Welsh timber left Aberystwyth as part of a trial that could see regular freight traffic return to the Cambrian line.

Related news items

Tags: x Aberystwyth x Timber x Railfreight