Date: 18/11/2022
Drax Group has awarded WH Davis a contract to supply a further 30 high-capacity biomass wagons, which the generator says will reduce emissions on the route from the Port of Tyne to its power station in North Yorkshire by more than 25%.
External links
Railway Gazette
Related news items
Tags: x Drax Group x Drax Power Station x Port of Tyne x WH Davis