Barnes Bridge to reopen by no later than December 5 as Network Rail engineers carry out repairs [Network Rail]





Date: 25/11/2022

The railway line between Barnes Bridge and Kew Bridge will reopen by no later than December 5 as Network Rail engineers carry out repairs to the Grade II listed structure over the River Thames.


External links

Barnes Bridge to reopen by no later than December 5 as Network Rail engineers carry out repairs

Network Rail

The railway line between Barnes Bridge and Kew Bridge will reopen by no later than December 5 as Network Rail engineers carry out repairs to the Grade II listed structure over the River Thames.