Date: 25/11/2022
The railway line between Barnes Bridge and Kew Bridge will reopen by no later than December 5 as Network Rail engineers carry out repairs to the Grade II listed structure over the River Thames.
External links
Network Rail
The railway line between Barnes Bridge and Kew Bridge will reopen by no later than December 5 as Network Rail engineers carry out repairs to the Grade II listed structure over the River Thames.