Date: 23/03/2023
Work is underway to install a temporary bridge structure and build a road to enable the demolition and reconstruction of the A955 Leven Rail (Bawbee) bridge.
External links
Network Rail
Work is underway to install a temporary bridge structure and build a road to enable the demolition and reconstruction of the A955 Leven Rail (Bawbee) bridge.
Related images
Related news items
Tags: x Bawbee Bridge x Levenmouth