Date: 29/06/2023
A multi-million pound signalling control suite has been switched on for the first time at Gosforth Metro depot as part of the countdown to the new fleet entering service for customers. The newly built facility will be used by Stadler to safely manage Metro train movements between the depot and the mainline, replacing an ageing control room in the old depot which had technology dating back to the 1980s.
External links
Tyne and Wear Metro
Related news items
Tags: x Gosforth Sheds x Gosforth Depot x Tyne and Wear Metro x Signalling