Cameron Bridge station footbridge installed as part of £116m project [Network Rail]





Date: 22/09/2023

Network Rail has installed the footbridge at Cameron Bridge station as part of the new £116m Levenmouth Rail Link development.


External links

Cameron Bridge station footbridge installed as part of £116m project

Network Rail

Network Rail has installed the footbridge at Cameron Bridge station as part of the new £116m Levenmouth Rail Link development.

Related images

Network Rail has installed the footbridge at Cameron Bridge station as part of the new £116m Levenmouth Rail Link development. Eleven sections making up the main framework of the steel bridge and lift-towers were successfully craned into position on the new platforms. The largest section, the main bridge span, is 15 metres long and sits more than six metres above the track to enable clearance for electrification.
Location: Cameron Bridge
Company: Leven Railway
/09/2023 Network Rail


Related news items

Tags: x Cameron Bridge x Footbridge