Date: 31/10/2023
Work to replace the bridge over the railway on Glasgow's Shields Road has taken a step forward with the installation of a temporary footbridge.
External links
Network Rail
Work to replace the bridge over the railway on Glasgows Shields Road has taken a step forward with the installation of a temporary footbridge.
Related images
Related news items
Tags: x Shields Road