Dates

  /02/1880Nottingham and Melton Line (Midland Railway)
Opened to local passenger trains.
  /02/1885Nottingham and Melton Line (Midland Railway)
Holwell Branch brought into use.
  /07/1888Nottingham and Melton Line (Midland Railway)
London St Pancras - Glasgow St Enoch and Edinburgh Waverley trains start to use line.
29/04/1967Nottingham and Melton Line (Midland Railway)
Line closed to passenger expresses. It was latterly used by express trains until the WCML was upgraded.
01/11/1968Nottingham and Melton Line (Midland Railway)
Last freight train.
04/11/1968Nottingham and Melton Line (Midland Railway)
Closed as through route. The line was then developed as a test track and was host to trains such as the APT and Pendolinos as well as the famous test crash of a train into a nuclear flask.
14/11/2005Nottingham and Melton Line (Midland Railway)
Neither Network Rail nor the Government express any interest in taking over the now redundant test track.