Old Kent Road Extension and Shoreditch Extension (East London Railway)




Dates

27/04/2010North London Railway
East London Railway to North London Railway link (East London Line)
Old Kent Road Extension and Shoreditch Extension (East London Railway)
The East London Line, 2.17 miles rebuilt at a cost of £1billion from Dalston Junction to New Cross, is opened by London Mayor Boris Johnson. Considered part of the London Overground.

Portions of line and locations

This line is divided into a number of portions.


Shoreditch Extension

The 1869 station building at Shoreditch seen in July 1985 when it was the northern terminus of the London Underground East London Line. One of the ...
Ian Dinmore 12/07/1985
View south east over the platforms at Shoreditch in July 1985 looking towards Whitechapel. The former northern terminus of the East London Line closed ...
Ian Dinmore 12/07/1985
2 of 2 images.


378137, with a southbound London Overground service, arriving at Whitechapel station on a snowy 20th January 2013. ...
David Bosher 20/01/2013
View from the low-level (East London Line) platforms at Whitechapel on 27 May as an Eastbound District Line train leaves the high level station for ...
John Thorn 27/05/2014
2 of 2 images.




Class 378 unit on a southbound London Overground service about to depart from Wapping station and enter the eastern portal of the historic Thames ...
David Bosher 01/03/2014
A deserted Wapping Station during line closure on 30 May for platform lengthening work. ...
John Thorn 30/05/2014
View south from Wapping station through the Thames Tunnel on 26 May 2014. ...
John Thorn 26/05/2014
3 of 3 images.





Old Kent Road Extension




New Cross Extension