Swansea and Neath Railway





Dates

06/08/1861Swansea and Neath Railway
Incorporated.
  /  /1863Swansea and Neath RailwayVale of Neath Railway
Swansea and Neath Railway acquired by the Vale of Neath Railway.
15/07/1863Swansea and Neath Railway
Opened.
15/07/1863Swansea and Neath Railway
Opened as a mixed gauge line from Neath Junction to Wind Street Junction by the North and South Docks (east bank of the River Tawe).
01/08/1863Swansea and Neath Railway
Swansea Wind Street station opened.
01/03/1873Swansea and Neath Railway
Swansea Wind Street station closed, traffic diverted to the South Wales Railway Swansea station.
  /10/1880Swansea and Neath Railway
Swansea East Dock (by the Prince of Wales Dock) opened.
  /07/1924Swansea and Neath Railway
Neath Low Level renamed Neath Bridge Street.
  /09/1926Swansea and Neath Railway
Neath Bridge Street renamed Neath Riverside.
28/09/1936Swansea and Neath Railway
Swansea East Dock closed to passengers.
15/07/1964Swansea and Neath Railway
Neath Low Level closed.

Portions of line and locations

This line is divided into a number of portions.