Date: 16/12/2011
THE campaign for a Dornoch rail crossing has received “a massive boost” following a survey which was conducted by a local pressure group. The Dornoch Rail Link Action Group surveyed more than 500 rail users over the past three months and is delighted with the findings. They show overwhelming support for the crossing which would reduce journey times on the Far North line by 45 minutes. The trip between Wick and Inverness currently takes four hours and 26 minutes.
External links
John O'Groats Journal
THE campaign for a Dornoch rail crossing has received a massive boost following a survey which was conducted by a local pressure group.
Related images
Related news items
Tags: x Far North Line x Dornoch Rail Crossing