Date: 19/04/2016
A MISTAKE by a signaller is thought to be the cause of a collision between two trains in a platform at Plymouth earlier this month in which around 35 people were hurt. The accident, on 3 April, occurred when a four-car unit arriving from Penzance at 15.30 collided at about 15mph (24km/h) with a stationary London-bound intercity train which was already partly occupying the same platform.
External links
Rail News
A MISTAKE by a signaller is thought to be the cause of a collision between two trains in a platform at Plymouth earlier this month in which around 35 ...