New Trains for Old: From Upminster to Upcycled Vivarails D-Train [Railway Hub]





Date: 01/07/2020

Ben Jones visits Long Marston to find out how redundant District Line trains are being rebuilt to provide cheaper and greener alternatives to brand new multiple units and how Vivarail is looking to the future with new methods of propulsion.


External links

New Trains for Old: From Upminster to Upcycled “ Vivarails D-Train - The Railway Hub

Railway Hub

Ben Jones visits Long Marston to find out how redundant District Line trains are being rebuilt to provide cheaper and greener alternatives to brand new multiple units “ and how Vivarail is looking to the future with new methods of propulsion. SOMEWHERE deep in rural Warwickshire, a former Londo ...

Related images

Battery powered Vivarail D-train 230002 moves out of the yard at Boness on 9th October 2018. The unit took a power charge before public demonstrations the following day.
Location: Bo^ness
Company: Slamannan and Borrowstounness Railway
09/10/2018 Bill Roberton
Ex-LU D78 car with 'modified front end' in the yard at Long Marston on 17 August 2015. The 'modification' resulted from a controlled crash into a 3 tonne tank of water during testing of the bodyshells, which are being converted to low cost 'D-Train' units by Vivarail.
Location: Long Marston
Company: Stratford-on-Avon Branch (Oxford, Worcester and Wolverhampton Railway)
17/08/2015 Ian Dinmore
Penny for them... Awaiting departure time at Kensington Olympia on 22 July 2005, the driver of D Stock unit 7121, forming a District Line service to High Street Kensington, studies his newspaper. This was the morning after the failed bombing attempts at Warren Street, Shepherds Bush and Oval stations.
Location: Kensington Olympia
Company: Earls Court Lines (Metropolitan District Railway)
22/07/2005 John Furnevel


Related news items

Tags: x Long Marston x D-Train x Class 230 x Vivarail

DateItem
08/09/2020Class 230 variants approved for passenger service [Railway Gazette]
20/08/2020Isle of Wight transformation gets underway [Railway Gazette]
16/03/2020Investigation reveals number of 'ghost trains' lying idle in Britain [The Guardian]
23/04/2019Vivarails D-Train enters service [Rail]
19/02/2019Birmingham: Washwood Heath train factory demolished [Rail Engineer]
24/08/2018First West Midlands D-Train unveiled [Rail]
01/03/2018D-Trains ordered for Bedford Bletchley [Railway Gazette]
17/05/2017Vivarail reveals new D-Trains will be available in 2018 [Rail]
30/12/2016Ten evacuated as Kenilworth train catches fire [BBC News]
02/12/2016Vivarail trial start date delayed from October to February [RTM]
30/07/2016Converted Underground train could be running soon [Rail News]
24/08/2015Prototype Vivarail D-Train on test [International Railway Journal]