Date: 17/09/2020
The Edinburgh and Glasgow Railway is to reopen fully on Monday the 21st of September following repairs after considerable flood damage was caused by a breach of the Union Canal.
Related news items
Tags: x Edinburgh and Glasgow Railway x Flood x Polmont