Date: 30/09/2020
After 54 years of redundancy, one of the Great Central Railway^s most iconic structures is on the brink of a new life as an aerodynamic testing facility. Catesby Tunnel, which is 1.7 miles in length, was built from nine shafts at a remarkably quick average rate of 110 yards per month.
External links
Rail Engineer
Related news items
Tags: x Catesby Tunnel x Great Central Railway