Safety message clear as Leven work ramps up [Network Rail]





Date: 11/08/2022

Work to build the second mile of new track on the Levenmouth Rail Link is now underway.


External links

Safety message clear as Leven work ramps up

Network Rail

Work to build the second mile of new track on the Levenmouth Rail Link is now underway.

Related images

With the River in close proximity, retaining walls are being upgraded to support the future double-tracked railway. [The line was singled in 1972 having been doubled for Methil Docks traffic around 1909. -RS]
Location: Cameron Bridge
Company: Leven Railway
11/08/2022 Network Rail
Increased work volume means more vehicle movements on the project to construct the new Levenmouth rail link. A Moxy crosses a bridge fitted with bog mats and timber.
Location: Cameron Bridge
Company: Leven Railway
11/08/2022 Network Rail
Embankments are being reprofiled and upgraded to support double tracking of Levenmouth Rail link. Shown here are benches being cut into into banking.
Location: Tullybreck Level Crossing
Company: Leven Railway
/08/2022 Network Rail


Related news items

Tags: x Levenmouth Line