Bairds and Dalmellington Limited

Introduction

This is the forth phase of the Dalmellington company.






Dates

  /03/1980Ayr and Dalmellington RailwayBairds and Dalmellington Limited
Last train, preserved locomotive and wagons, runs from Cutler Sidings to Minnivey Nos 4,5. Cutler Sidings (excluded) to Minnivey Nos 4,5 (excluded) closed and lifted.
  /  /1988Bairds and Dalmellington Limited
Track re-laid from alongside the Dunaskin Central Washer (now closed) to Chalmerston Loading Pad. Dunaskin Central Washer sidings lifted. Connection made to preserved line at the former Minnivey Nos 4,5.