Glasgow and Ardrossan Canal



Dates

  /  /1791Glasgow and Ardrossan Canal
Proposed by Earl of Eglinton. (The route between Elderslie and Port Eglinton Basin was later used by the Paisley Canal Line (Glasgow and South Western Railway)).
  /  /1807Glasgow and Ardrossan Canal
Construction begins. (The route between Elderslie and Port Eglinton Basin was later used by the Paisley Canal Line (Glasgow and South Western Railway)).
  /  /1811Glasgow and Ardrossan Canal
Last section built into Port Eglinton Basin, Glasgow. The canal ran from Johnstone to Port Eglinton Basin. An aqueduct across the Clyde to join up with the Forth and Clyde Canal was considered, but not built. (The route between Elderslie and Port Eglinton Basin was later used by the Paisley Canal Line (Glasgow and South Western Railway)).
01/07/1885Paisley Canal Line (Glasgow and South Western Railway)
Opened from Port Eglinton Junction to Elderslie Junction. The line uses much of the former route of the Glasgow and Ardrossan Canal, the line runs skew across a former aqueduct bridge at Paisley Hawkhead. The canal route under the main line at Elderslie was used for a link to the Bridge of Weir Railway so that Greenock Princes Pier bound trains did not have to cross the track used by Ayr to Glasgow trains. The former Port Eglinton Basin becomes the Salkeld Street Parcels depot.