All ready for the move into its permanent location the next day, with the heavy lift vehicle in position below it, is the fully fitted out new concrete bridge assembly that is to replace the present low stone arched Haigh Lane rail overbridge in a 52 hour weekend line closure.
Location: Haigh (former)
Original line: Sheffield, Rotherham, Barnsley, Wakefield, Huddersfield and Goole Railway
Photographer: David Pesterfield
Contact photographer: David Pesterfield
Date: 05/08/2016
Image number: 56041