Contact the news and picture editor. |
![]() ![]() |
The haulier will have two buildings totalling a huge 538,000 square feet. Work has started on new Eddie Stobart facilities at a massive Daventry industrial estate. The firm is building a two-unit campus at Daventry International Rail Freight Terminal (Prologis RFI DIRFT), with cladding now being installed on the buildings.
(Permalink) DIRFT Eddie Stobart Railfreight ![]() Daventry International Rail Freight Terminal: A landslip at Kilsby led to a Northbound closure of the WCML from 27th January 2021, and diversions via Northampton. On 9th February this bright red Voyager contrasts vividly with the surrounding (ine ... ![]() Daventry International Rail Freight Terminal: A mathematical puzzle: If 66004 picks up 4 Cargowaggons from the siding nearest to the Eddie Stobart warehouse, backs them onto the rake in the other siding, pulls a total of 12 wagons out, then depos ... ![]() Daventry International Rail Freight Terminal: It's a lonely life a-shunting. Malcolm group locomotive 08823 returns to the main yard at DIRFT on 18 December 2015 after depositing a rake of Cargowaggons by the Eddie Stobart warehouse see image [[5 ... |