News - Eddie stobart

Contact the news and picture editor. Twitter feed    RSS Feed

Themes   Caledonian MacBrayne   P&O   CMAL   Cairnryan   Larne   Audit Scotland   ScotRail   Ferguson Marine   Glasgow District Subway   Electrification   Railfreight   Derailment   RMT   Dundee   Levenmouth   Signalling fault   Cancellations   Statistics   Transport Scotland   PS Maid of the Loch   Dalfaber Level Crossing   Aberdonian   

The haulier will have two buildings totalling a huge 538,000 square feet. Work has started on new Eddie Stobart facilities at a massive Daventry industrial estate. The firm is building a two-unit campus at Daventry International Rail Freight Terminal (Prologis RFI DIRFT), with cladding now being installed on the buildings.
(Permalink) DIRFT Eddie Stobart Railfreight


Daventry International Rail Freight Terminal: A landslip at Kilsby led to a Northbound closure of the WCML from 27th January 2021, and diversions via Northampton. On 9th February this bright red Voyager contrasts vividly with the surrounding (ine ...
Ken Strachan 09/02/2021


Daventry International Rail Freight Terminal: A mathematical puzzle: If 66004 picks up 4 Cargowaggons from the siding nearest to the Eddie Stobart warehouse, backs them onto the rake in the other siding, pulls a total of 12 wagons out, then depos ...
Ken Strachan 08/02/2021


Daventry International Rail Freight Terminal: It's a lonely life a-shunting. Malcolm group locomotive 08823 returns to the main yard at DIRFT on 18 December 2015 after depositing a rake of Cargowaggons by the Eddie Stobart warehouse see image [[5 ...
Ken Strachan 18/12/2015

KML version