This day in history 23 December

Contact the news and picture editor.

Images



Polmadie Shed: Motherwell Crab 2-6-0 42795 takes empty mineral wagons past Polmadie in dismal December weather in 1965.

Polloc and Govan Railway
Robin McGregor 1965


Hawick [2nd]: The lever frame at Hawick South signal box at Christmas time in 1968. The photograph was taken at approximately 11.30pm on 23 December with the route set for a special Edinburgh - Hawick parcels train (no, not him) to run back through the crossover from the up to the down line. A notable feature on the instrument shelf at Hawick South was a bell-push labelled 'Station Hotel' which was used to alert intending passengers in the bar 5 minutes before a train was due to depart.

Border Union Railway (North British Railway)
Bruce McCartney 1968


Hawick [2nd]: Welcome to Hawick! Greetings from a pair of young fans as D19 brings the 09.30 Edinburgh - Carlisle into Hawick on 23 December 1968. (This train also carried through coaches for St Pancras.) The Hawick pilot, Clayton D8574, stands in the background.

Border Union Railway (North British Railway)
K A Gray 1968


Carlisle: D31 at Carlisle station on 23 December 1968 with the up Thames - Clyde Express.

Caledonian Railway
K A Gray 1968


Hawick [2nd]: Extract from the signalman's log at Hawick South box on the run up to Christmas 1968, with less than two weeks to go before final closure of the Waverley route. Note the signature of Gordon Hall, starting the nightshift at 22.00 on 23 December and going off duty at 06.00 on the morning of Christmas Eve. It was signalman Hall who swapped shifts on 5 January to be on duty to pull the signal for the last train but who, due to events beyond his control, was unable to do so, having instead to pass on verbal instructions to driver Fleming of Haymarket that night. See image [[21882]]

Border Union Railway (North British Railway)
Bruce McCartney 1968


Hawick [2nd]: Clayton D8574 shunts vans at Hawick in December 1968. [Editor's note: the two diligent young gentlemen standing at the end of the platform on the right are Bruce Cranston and Ross Turnbull... who had spent the previous hour or so buying Xmas presents for their respective mothers, got fed up and headed here.] (With thanks to Ross Turnbull)

Border Union Railway (North British Railway)
K A Gray 1968


Carlisle: D1968 about to leave platform 7 at Carlisle on 23 December 1968 with the 1pm for Edinburgh Waverley.

Caledonian Railway
K A Gray 1968


Watford Junction: Watford Junction at dawn on Friday 23rd December 1977. The Class 501 EMU at platform 2 is the rush hours only Croxley Green shuttle service awaiting its next trip. Alongside at platform 3, and again rush hours only, is a Bakerloo tube service to South London (Elephant and Castle). Trains from here to Croxley Green ran for the last time in March 1996 and Bakerloo services were terminated further south from September 1982

London and Birmingham Railway
Mark Dufton 1977


Dauntsey: 50002 Superb eastbound at Dauntsey on the GWR main line on 23 December 1983. The locomotive is currently being restored by the Devon Diesel Society.

Great Western Railway
Peter Todd 1983


Barrhill: 27005 at Barrhill on 23.12.1986 at 10.25 with an additional parcels working to Stranraer, due to pre-Christmas demand.

Girvan and Portpatrick Junction Railway
Michael Green 1986


North Queensferry Tunnel: The lighting, which would now be deemed inadequate, makes the interior of this Class 117 seem rather cosy, as does the enforced intimacy of table-less facing seats (not so much fun at the time). Whatever the bloke with the glabrous pate is doing he isn't checking his phone; even if he could afford one in 1994 there would be nothing to check.

Forth Bridge Railway
David Panton 1994


Auchencorth Peat Moss Railway: Shed scene on the Auchencorth peat railway to the south of Penicuik, Midlothian, with petrol locomotive T1 standing in the yard. The photograph was taken two days before Christmas 2003, with operations closed down for the holiday period. The 2ft gauge system at Auchencorth Moss was operated on behalf of William Sinclair Horticulture Ltd. (Note the disc signal mounted on the shed roof.)

Auchencorth Peat Moss Railway
John Furnevel 2003


Auchencorth Peat Moss Railway: A petrol locomotive on the 2ft gauge peat railway operated by William Sinclair Horticulture Ltd at Auchencorth Moss to the south of Penicuik in December 2003.

Auchencorth Peat Moss Railway
John Furnevel 2003


Monktonhall Colliery: 2004 view looking south over the remaining looped siding, which latterly served a loading pad at Monktonhall for final coal extraction. The loop was accessed from the south. Monktonhall Colliery was off to the right. To the left is the overgrown site of the Millerhill Yard Down Sorting Sidings.

Edinburgh and Dalkeith Railway
Ewan Crawford 2004


Straiton Sidings: View to compare with the more recent shot see image [[32922]]. There was a short siding (new in 1878) to the left of the line seen here and former cabin which stood to the left. This may have been for 'cripples'. Off to the right of the Straiton Branch exchange sidings was a rail served tip, accessed from the branch. At the time of the photograph the track a short distance behind the camera and up to the City Bypass overbridge was lifted.

Edinburgh, Loanhead and Roslin Railway
Ewan Crawford 2004


Carstairs: A fine selection of track machines assembled in the sidings at Carstairs on 23 December 2005. Photograph taken looking north from the station platform under a weak winter sun. The gathering was part of the preparations for scheduled engineering works on the WCML over the Christmas holiday period.

Caledonian Railway
John Furnevel 2005


Johnstone: Johnstone station, very early morning

Glasgow, Paisley, Kilmarnock and Ayr Railway
Graham Morgan 2006


Glasgow Central: The driver of the 0800 GNER service to Kings Cross awaiting the departure whistle.

Glasgow Central Station (Caledonian Railway)
Graham Morgan 2006


Glasgow Central: 91122 Tam The Gun departs Glasgow Central propelling the 0800 service to Kings Cross.

Glasgow Central Station (Caledonian Railway)
Graham Morgan 2006


Glasgow Central: 390001 Virgin Pioneer waits to depart with a London Euston service.

Glasgow Central Station (Caledonian Railway)
Graham Morgan 2006


Glasgow Central: 91102 Durham Cathedral at Glasgow Central.

Glasgow Central Station (Caledonian Railway)
Graham Morgan 2006


Glasgow Central: 67011 collecting the empty Caledonian Sleeper stock at Glasgow Central.

Glasgow Central Station (Caledonian Railway)
Graham Morgan 2006


Glasgow Central: 334011 sitting at Platform 11a, Glasgow Central.

Glasgow Central Station (Caledonian Railway)
Graham Morgan 2006


Glasgow Central: Mark 4 DVT at the front of an 0800 service to London Kings Cross.

Glasgow Central Station (Caledonian Railway)
Graham Morgan 2006


Drem: The up Highland Chieftain in GNER days. The 0755 Inverness - London Kings Cross HST speeds south through Drem station on 23 December 2007.

North British Railway
John Furnevel 2007


Shields Road: Track stockpiled at Shields Road ready for the works over Christmas.

Glasgow and Paisley Joint Railway
Ewan Crawford 2007


Dumbarton East: The newly cleaned and painted railway bridge at Dumbarton East. View looks east.

Lanarkshire and Dumbartonshire Railway
Ewan Crawford 2007


Wrexham General: The imposing former Great Western Railway staircase and lift tower to the footbridge at the North end of Wrexham General station, photographed in December 2009.

North Wales Mineral Railway
David Pesterfield 2009


Chinley: The 1045 hrs Northern Trains Manchester to Sheffield service has just called at Chinley on 23 December 2009. The Class 142 and 150 combination are seen heading eastwards, away from the camera in winter sunshine and with a blanket of snow on the ground. Merry Christmas

Peak Forest Railway (Midland Railway)
John McIntyre 2009


Cardiff Central: DRS Malcolm Rail liveried 66412 stabled in the sidings at the west end of Cardiff Central station on 23 December 2009. Freightliner later acquired 66412, along with nine other DRS 66s, and in October 2012 it was exported and is now in operation with Freightliner Poland.

South Wales Railway
David Pesterfield 2009


Manchester Piccadilly: Looking towards the buffers at Manchester Piccadilly on 23 December 2009. On the right in platform 1 is a Northern Rail service for Sheffield via New Mills and the Hope Valley, while on platform 4, a First TransPennine service to Hull is being prepared by coupling together a pair of two-car Turbostars.

Manchester and Birmingham Railway
John McIntyre 2009


Cardiff Central: DRS 66415 stands across Penarth Road bridge at the east end of Cardiff Central station in December 2009, in front of stored former Advenza Freight locomotive no 57005. As of December 2012 66415 is working with Freightliner, and 57005 is now with West Coast Rail Co but in store at Carnforth

South Wales Railway
David Pesterfield 2009


Chinley: 142011 calls at the very wide island platform at Chinley on 23 December 2009 on the 1045 hrs Manchester Piccadilly to Sheffield service. The unit has an out of use Class 150 attached to the rear on a positioning move... or was it for insurance?.

Peak Forest Railway (Midland Railway)
John McIntyre 2009


Leyland: A service heading to Hazel Grove from Preston in the hands of 142046 calls at a snowy Leyland on 23 December 2009.

North Union Railway
John McIntyre 2009


Airdrie: An Edinburgh Waverley - Helensburgh Central train formed by 334 001 heads west from Airdrie station on the afternoon of 23 December 2010.

New Monkland Line (Monkland Railways)
John Steven 2010


Northampton: The 15.25 to Euston has a good think about venturing out into the rain at Northampton on 23rd December. Sadly, the route to Bedford - which can just be seen heading off under the bridge - has not been available for some 47 years.

Northampton and Market Harborough Branch (London and North Western Railway)
Ken Strachan 2011


Carnforth: 92041 Vaughan Williams speeds a rake of containers south past the remains of Carnforth's main line platforms in the last bit of the daylight on 23rd December 2011

Lancaster and Carlisle Railway
Mark Bartlett 2011


Carnforth: The 1507hrs to Lancaster is already a few minutes late but will have to wait at Carnforth a little longer as a southbound container train has been given priority by the signallers. 153317 is on a Cumbrian Coast service with only the short run through Hest Bank to complete its journey.

Ulverston and Lancaster Railway
Mark Bartlett 2011


Northampton: The 15.50 to Milton Keynes, soaking wet at Northampton on 23rd December.

Northampton and Market Harborough Branch (London and North Western Railway)
Ken Strachan 2011


Haymarket: View west at Haymarket on 23 December 2012, with and the second phase of the new footbridge now in position.

Edinburgh and Glasgow Railway
John Yellowlees 2012


Haymarket: Work in progress at Haymarket. View from the platform on 23 December 2012.

Edinburgh and Glasgow Railway
John Yellowlees 2012


Haymarket: Looking east along platforms 2 & 3 at Haymarket on 23 December showing the scale of the construction work taking place there at present. The top corner of the 1842 E&G station building can be seen centre left.

Edinburgh and Glasgow Railway
John Yellowlees 2012


Loughton: LUL 1992 stock on a Central Line train to Epping departing from Loughton station, on 23rd December 2013. This is the Essex town's third station; the first was opened by the Eastern Counties Railway on 22nd August 1856 as the terminus of the line from Stratford. It was replaced with a new station by the Great Eastern Railway which extended the line to Ongar on 24th April 1865, the extension diverging just outside the original terminus which became a goods yard. In anticipation of the electrification of the line for LPTB Central Line trains, the present station was opened on 21st April 1940 but World War Two delayed the scheme and it was 21st November 1948 before tube trains reached Loughton with extension to Epping on 25th September 1949. The goods yard on the site of the 1856 station remained open until 1966, served by steam trains using the original ECR route between Stratford (Loughton Branch Junction) and Leyton and which remained in use for early morning DMU staff trains until 1970.

Ongar Extension (Great Eastern Railway)
David Bosher 2013


Hest Bank: The last Christmas Postal Extra of 2014 heads south behind DBS electric 90035. The train is passing the Hest Bank livery stables approaching the level crossing on 23rd December. The return trip from Shieldmuir to Warrington has been made on most weekdays in December.

Lancaster and Carlisle Railway
Mark Bartlett 2014


Alexandra Parade: ScotRail 334001, ultimate destination Cumbernauld, leaves Alexandra Parade heading north for Barnhill and Springburn on the morning of 23rd December 2014.

City of Glasgow Union Railway
Colin McDonald 2014


Shawfair: Looking south over Shawfair station on the afternoon of 23 December 2014, with notable progress on both the station footbridge and car park since the previous visit.

Millerhill Deviation (Network Rail)
John Furnevel 2014


Christmas: To all contributors and visitors to Railscot during 2014 - have a Merry Christmas... and a Happy 2015!

Christmas
S Claus 2014


Alexandra Parade: The 1053 service to Dalmuir seen from under the road bridge at Alexandra Parade on 23rd December 2014.

City of Glasgow Union Railway
Colin McDonald 2014


Alexandra Parade: 334037 bound for Dalmuir has just cleared the arched bridge at Alexandra Parade on the morning of 23rd December 2014.

City of Glasgow Union Railway
Colin McDonald 2014


King's Gate Junction: The points controlling the changeover between single and double line sections of the Borders Railway at Kings Gate, just south of the Edinburgh City Bypass, on 23 December 2014, with everything looking fairly tidy for the Christmas shut-down. The yellow sign reads, 'STOP - Points 536 - Contact BAM RLC before continuing'.

Edinburgh and Hawick Railway (North British Railway)
John Furnevel 2014


Alexandra Parade: 334037 forming the 1023 Cumbernauld - Dalmuir service arrives at Alexandra Parade on 23rd December 2014.

City of Glasgow Union Railway
Colin McDonald 2014


Bellgrove Junction: An unidentified electric multiple unit, sandwiched between two translator coaches, is hauled by 47805 up the gradient towards Eastfield on 23rd December 2015.

City of Glasgow Union Railway
Colin McDonald 2015


Farnworth Tunnel: A Blackpool to Huddersfield (via Manchester Victoria) service exits the southern portal of the new Farnworth Tunnel on 23 December 2015. On the left there is still track in place through the old small bore tunnel which had been used for all services for 7 months but it is no longer connected. A normal timetable was resumed on 14 December after the Down line was connected up.

Manchester, Bolton and Bury Railway
John McIntyre 2015


Preston: Having arrived at Preston from Carlisle via the Cumbrian Coast, 37401 'Mary Queen of Scots prepares to head north to Barrow with the 2C47 1004 service on 23 December 2015.

North Union Railway
John McIntyre 2015


Didcot Parkway: Freightliner 70011 takes an eastbound Freightliner past Didcot station on 23rd December 2015.

Great Western Railway
Peter Todd 2015


Didcot Parkway: HST power car 43126, bedecked in Bristol - European Green Capital 2015 bodyside vinyls, speeds through Didcot on 23rd December 2015 passing under the temporary footbridge.

Great Western Railway
Peter Todd 2015


Didcot Parkway: Colas Rail Plasser & Theurer Switch & Crossing Tamper machine DR73935 passing through Didcot station on 23rd December 2015.

Great Western Railway
Peter Todd 2015


Hest Bank: A special ECS movement from Glasgow to Burton-on-Trent, presumably conveying coaches that had been used on the Forth Bridge extra services, makes a colourful spectacle as it heads south through Hest Bank behind Freightliner 90045. Rather unusually for December 2015 the train passed Lancashire in bright sunshine.

Lancaster and Carlisle Railway
Mark Bartlett 2015


Farnworth Tunnel: A Blackpool North service leaving the new Farnworth Tunnel on 23 December 2015. The train is passing under the new Cemetery Road bridge and approaching the repositioned Farnworth station. To the right is a section of the old platform, with the former down tunnel in the background.

Manchester, Bolton and Bury Railway
John McIntyre 2015


Milton Keynes Central: A Voyager at MK Central heading for London - there seemed to be such a service every two minutes. Something to do with Christmas, perhaps. see image [[46577]]

London and Birmingham Railway
Ken Strachan 2016


Milton Keynes Central: The sparse - six trains a week - service from MKC to Adderley Park may make you feel like a Minor Traveller see image [[42528]].

London and Birmingham Railway
Ken Strachan 2016


St Anton Am Arlberg (Old): The front of the old station building in St Anton am Arlberg, Austria, now an anex of the Post Hotel. 23rd December 2017.

Österreichische Bundesbahnen
Alastair McLellan 2017


St Anton Am Arlberg (New): Bahn Touristik Express from Den Hagg enters St Anton am Arlberg on 23rd December 2017, running some 50 mins late due to international problems according to the station announcer. This train is basically a sleeper/ couchette train departing on a Friday evening bringing skiers to the Alps.

Österreichische Bundesbahnen
Alastair McLellan 2017


St Anton Am Arlberg (Old): Platform view of the old station in St Anton am Arlberg on 23rd December 2017. The railway originally ran through the centre of town but this caused traffic problems and in 2001 a new 6km section of track was built to divert the line and a new station replaced the 1884 structure, which is now part of the Post Hotel.

Österreichische Bundesbahnen
Alastair McLellan 2017


St Anton Am Arlberg (New): Wien to Zurich Railjet service pulls into St Anton am Arlberg on 23rd December 2017. Having departed at 0530 it will arrive at its destination at 1320hrs.

Österreichische Bundesbahnen
Alastair McLellan 2017


St Anton Am Arlberg (New): Double headed EC163 from Zurich to Graz pulls into St Anton am Arlberg on 23rd December 2017. The first two coaches are Swiss 1st Class Gotthard Express Panorama coaches.

Österreichische Bundesbahnen
Alastair McLellan 2017


St Anton Am Arlberg (New): EC163 Zurich to Graz departs St Anton heading towards Innsbruck, next stop Landeck, on 23rd December 2017. The coach is an SBB Gotthard Express Panorama vehicle.

Österreichische Bundesbahnen
Alastair McLellan 2017


St Anton Am Arlberg (New): Point heaters working well at St Anton am Arlberg station on 23rd December 2017. The temperature at the time was -5C.

Österreichische Bundesbahnen
Alastair McLellan 2017


Newton: Comin' at ya. A westbound service pulls out of Newton on 16th December 2017. 318s are the most common fare on Argyle Line services, as seen here. 314s form the Cathcart Lines trains - for now, anyway.

Clydesdale Junction Railway
David Panton 2017


Princes Street Gardens: Princes Street Gardens on 23rd December 2017, and a novelty steam train trundling around as part of the Christmas market with Santa Claus driving. To the right is Waverly station.

Edinburgh and Glasgow Railway
Alan Cormack 2017


Edinburgh Princes Street: Edinburgh's impressive Caledonian Hotel at the east end of Princes Street, looking very festive and nicely decorated on 23rd December 2017. I wonder how many people now realise that there was a very substantial railway station behind the hotel.

Caledonian Railway
Alan Cormack 2017


Constitution Street [Tram]: Looking south along Constitution Street, Leith, at excavation work for the Newhaven extension to the Edinburgh Trams route, on 23 December.

Edinburgh Trams
Bill Roberton 2019


Ashley: 66089 runs through Ashley in Cheshire on 23rd December 2021, working waste transfer wagons from Knowsley near Kirkby to Wilton on Teesside. These trains come off the Kirkby branch at Wigan Wallgate but rather than go direct through Manchester Victoria they head down the WCML to Hartford before joining this line to Altrincham. They then run through Stockport, Denton, Ashton Moss and Miles Platting before eventually gaining the Calder Valley route towards Yorkshire, an extra forty miles on the journey but avoiding Platting bank. Empties to Knowsley take the direct route.

Cheshire Midland Railway
Mark Bartlett 2021


Ashley: 150127 leads a 4-car Sprinter calling at Ashley on a Manchester Piccadilly to Chester service on 23rd December 2021. The station building here is a private residence as Ashley is now unstaffed. There was once a small goods yard to the right of the point where the train is.

Cheshire Midland Railway
Mark Bartlett 2021


Ashley: A grey day at Ashley as a Manchester to Chester service pulls away heading for the next stop at Mobberley on 23rd December 2021.

Cheshire Midland Railway
Mark Bartlett 2021


Events


Events from the chronology which occured on this day. This generally lists events before 1995, the creation of the website.

YearCompaniesDescription
1858Morayshire RailwayRothes to Craigellachie opened.
1859Dublin and Kingstown RailwaySiding from Kingstown Harbour to the steamer pier, Carlisle Pier, opened.
1892South Clare RailwaysMiltown Malbay (West Clare Railway) to Moyasta Junction opened to passengers.

News


These are old news items which which occured on this day. This generally lists events after 1995, the creation of the website.

YearCompaniesDescription
1999Firm wins mountain rail contracts lift [BBC News[The final contracts, worth nearly 10m, have been awarded for work on the UK^s first funicular railway, being built in the Cairngorms. Morrison Construction Ltd will demolish the existing chairlift and assemble the new of the new funicular stations. The contracts were awarded by Highlands and Islands Enterprise (HIE) after a competitive tendering exercise which included European-wide advertising. Morrison, which won the civil engineering contract for the first phase of development in 1998, will begin off-site fabrication of the supports for the railway this winter.
2005Car park obstacle to rail travel [BBC News]Action is promised to tackle the shortage of park-and-ride schemes at Scottish railway stations.
2009Steam train^s snow rescue [BBC News]Passengers were rescued by a steam locomotive after modern rail services were brought to a halt by the snowy conditions in south-east England.
2010Images reveal far north line^s problems with snow [BBC News]Photographs taken by rail staff have revealed the depths of snow that have affected the Far North Rail Line and disrupted services to Wick.
2010Train performance hit by severe winter weather [Network Rail Article]The severe winter weather continues to affect train performance across most parts of the country.
2010National Express comes in from the political cold [Telegraph]National Express, the company former transport secretary Lord Adonis tried to run off the railways, has won a two-year extension to its c2c franchise after achieving record-breaking punctuality.
2011^Luxury^ makeover for toilets on ScotRail^s Glasgow to Edinburgh service [Daily Record]SCOTRAIL passengers on the Glasgow to Edinburgh service can now spend a penny in style – after the onboard loos were given a “luxury” makeover. As our pictures show, the toilets have been decorated with little ceramic vases on a wooden shelf, some wall art and even a potted orchid.
2011Strike cancels 100 trains as shoppers struggle to get home for Christmas [Scotsman]NETWORK Rail has insisted Boxing Day passengers will not be disrupted by a signallers’ strike, despite having to cancel around 100 trains today. The firm admitted it had been overconfident in announcing last week that ScotRail would be able to run normal services on Christmas Eve, at the start of a three-day walkout at the main signalling centre in Glasgow. It explained that some of the managers and non-union staff who had been expected to cover for the strikers were found to be not available. That forced Network Rail to announce on Wednesday that the frequency of ScotRail trains on five routes would be cut by up to half today. The move will leave shoppers and other festive travellers with one train an hour on lines between Glasgow Central and Barrhead, Paisley Canal and Whifflet, and on the Cathcart Circle in Glasgow via Maxwell Park. Glasgow-Gourock trains will be cut from three to two per hour.
2012UK floods: Exeter railway tracks protected by dam [BBC News]Flooding problems in Devon are continuing after the River Exe burst its banks. Railway engineers are working alongside the emergency services to try and prevent water reaching a vital signal box on the Paddington to Penzance line at Exeter.
2013Metrolink will start work on second Manchester city crossing in January [MEN]Work on a second Metrolink line through the heart of the city centre will begin in January. The three-year £165m Second City Crossing project will allow more trams to cross the heart of Manchester. Starting in Lower Mosley Street, it will run through St Peter^s Square before turning down Princess Street and along Cross Street. After Corporation Street, it will re-join the existing line just outside Victoria station. The planned finish date is early 2017 – but the section up to Exchange Square could be ready in 2015. [From Mark Bartlett]
2014Gwili Steam Railway back on track after line extension [BBC News]Next year will be an important milestone for the Gwili Steam Railway near Carmarthen. After a 15-year project, a new 1.75 mile (2.8km) extension to the line will be opened, doubling the current length of track. Some of the views seen along the length of the line have not been seen by the travelling public for almost 50 years. Guests were given a preview recently, travelling in steam train carriages to a new station at Abergwili.
2017New December 2018 Tube Map Featuring the Elizabeth Line Unveiled [Rail News]The start of Elizabeth line services, which will transform transport in London with quicker, easier and more accessible journeys, is now just a year away. To mark the countdown, Transport for London (TfL) has released a December 2018 Tube map with the Elizabeth line displayed. Its inclusion will be among the most significant changes to the look of the Tube map in recent decades.
2018Virgin Trains gets one-year extension to run west coast mainline [The Guardian]Decision to extend operation comes after failure of Virgin Trains East Coast franchiseVirgin Trains has been granted another year to run the west coast mainline, months after the government had to renationalise another line in which the rail operator had a stake.The route, connecting London with Birmingham, Chester, Liverpool, Manchester and Edinburgh, will remain under Virgin Trains operation until March 2020.
2019LNER^s retro High Speed Train bound for storage [RAIL]HST repainted into original livery for LNER farewell tour to move to Ely for storage
2019ScotRail customers raise more than £4,000 on farewell tour [ScotRail]ScotRail customers helped raise more than £4,000 for charity during a special train journey last week. The train operator arranged the farewell tour for its fleet of Class 314 trains on Wednesday, 18 December in aid of its charity partner, MND Scotland. More than 300 people came along to travel on the tour around Strathclyde, and say goodbye to the trains which had served Scotlands Railway the past 40 years.