Blairenbathie and Blairadam Collieries Branch (North British Railway)




Dates

30/07/1866Devon Valley Railway
Blairenbathie and Blairadam Collieries Branch (North British Railway)
Devon Valley Railway Act gives permission for a branch from Rumbling Bridge [1st] to Wattie's Ford Bridge and an extension from there to Kelty on the Kinross-shire Railway, much of what was later used for the Blairenbathie and Blairadam Collieries Branch (North British Railway). Another branch to Newhall near Solsgirth also approved. Branches not built.
  /  /1873Blairenbathie and Blairadam Collieries Branch (North British Railway)
Line opened, partly or compeletly or came under North British Railway control.
06/01/1964Blairenbathie and Blairadam Collieries Branch (North British Railway)
Blairenbathie Colliery to Kelty (excluded) closed.

Portions of line and locations

This line is divided into a number of portions.