These locations are along the line.
This was a two platform station west of the approach road to Workington Bridge over the River Derwent, the road crossed on a bridge. The goods yard was to the east of the road.
...
This was the east end of a curve from the Cleator and Workington Railway where it met the existing Cockermouth and Workington Railway.
...
Tinplate works from 1857. Dam and reservoir to north of site.
...
...
More details...
More detailsThis was the junction between the Cockermouth and Workington Railway of 1847 and the later Cockermouth, Keswick and Penrith Railway of 1865.
...
This was the eastern terminus of the Cockermouth and Workington Railway.
...