This was built as a double track tunnel between Hutcheon Street station and Schoolhill station. The tunnel is 280 yards long.
The line is presently single track. To the north, at Kittybrewster [2nd], it has been doubled through to Inverurie (2019) and to the south, at Aberdeen, the line is double.
During construction the tunnel roof collapsed, leading to a delay of the opening of the railway.