This goods yard was at the east end of a loop laid on the south side of the line between Parkhead Junction [NB] and Haghill Junction around 1900.
The yard was built to replace the original goods yard at Parkhead North. (This was obliterated with the laying out of a yard to the south of the station and quadrupling of the line.)
Approach was from the west and the sidings were immediately north of Parkhead North station.
Nearby stations Parkhead North Parkhead Stadium Duke Street Alexandra Parade London Road [Glasgow] Carntyne Bellgrove Bridgeton [1st] Bridgeton Bridgeton [2nd] Bridgeton Goods Dalmarnock Gallowgate Central Garngad Tollcross | Parkhead Shed Parkhead Forge Parkhead Junction [NB] Carntyne Foundry Haghill Destructor Netherfield Chemical Works Parkhead Junction [CR] Carntyne Railway Wheel and Axle Works Carntyne Crane Works Vinegarhill Switchback Railway Carntyne Iron and Steel Works Haghill Goods Parkhead Tram Depot Tourist/other Camlachie Signal Box Celtic Park |
Location names in dark blue are on the same original line. |
/10/1966 | Glasgow City and District Railway Parkhead North Goods yard closed. |